Dunkin' / Baskin-Robbins Marana — Ground-Up Construction project by ITDG Construction
Ground-Up Construction

Dunkin' / Baskin-Robbins Marana

ClientDunkin' / Baskin-Robbins

Location

13952 Sandario

Duration

Ground-Up Construction

Completed

April 2025

Complete

Project Overview

ITDG completed a ground-up construction project for a dual-brand Dunkin' and Baskin-Robbins restaurant at 13952 Sandario in Marana, Arizona. Delivered in April 2025, the new-build facility gives both brands a combined presence in one of the Tucson metro area's fastest-growing communities.

The project encompassed the complete scope of ground-up restaurant construction—site preparation, concrete foundation, structural framing, mechanical, electrical, and plumbing systems, and full interior and exterior finishes. The completed building features a purpose-built drive-through lane, branded exterior finishes, illuminated signage, and a fully finished interior with service counters, menu displays, and seating areas designed to accommodate both the Dunkin' and Baskin-Robbins concepts under one roof.

Dual-brand QSR facilities require careful planning to ensure both concepts operate efficiently within a shared space. ITDG's vertically integrated approach allowed us to manage every phase of the build, delivering a turnkey restaurant ready for equipment installation and opening day.

Client
Dunkin' / Baskin-Robbins
Project Gallery

Visual Documentation

24 images from the completed project

Challenge & Solution

How We Delivered

The ChallengeHigh Complexity

Project Objective

Building a dual-brand quick-service restaurant from the ground up required accommodating two distinct brand standards within a single facility—separate service areas, menu systems, and operational flows for both Dunkin' and Baskin-Robbins. The project demanded precise coordination across all construction phases while meeting an aggressive timeline to support the planned opening in the growing Marana market.

ITDG SolutionDelivered

Our Approach

ITDG managed the full build from foundation through final finishes, self-performing electrical and plumbing to maintain schedule and quality control. Our team coordinated the drive-through infrastructure, dual-brand interior layout, and exterior finishes to deliver a cohesive facility that serves both concepts seamlessly. Tight trade sequencing across the compact restaurant footprint kept the project on track from concrete pour to certificate of occupancy.

RESULTS
Project Results

Delivered Outcomes

Dual-brand restaurant delivered on schedule in April 2025
Complete ground-up construction managed by ITDG
Drive-through lane and infrastructure fully operational
Interior built out for both Dunkin' and Baskin-Robbins operations
Turnkey facility delivered in a high-growth Marana corridor
Project Complete
5 objectives achieved
Start Your Project

Let's Build Together

Ready to discuss your next ground-up construction project? ITDG has the self-performing capabilities and track record to deliver results.

No obligation. We'll scope your project and provide a detailed proposal.

Licensed Across 13 States
Self-Performing Crews
No Sub Markups